Tausendwerk Partner firms
For installation firms and subcontractors

You install. We bring the orders.

Tausendwerk installs heat pumps as a subcontractor for plumbing and heating firms — across Germany, around four to five single-family home systems a week, with five teams of our own. For the weeks when that is not enough, we look for firms that take on one trade or a complete installation.

A prepared site, material supplied by the client, a fixed price per project. In return we check carefully who we send to a site.

No registration, no account. The result appears on screen straight away — including what is still missing.

5teamsour own, with a master craftsman on the team
5per weeksystems nationwide
11tradesthat we award
21dayspayment term in the framework contract
The sequence

One installation in 55 seconds

The model shows what is built on a site — trade by trade, in installation order: foundation, buried line, core drilling, outdoor unit, hydraulics in the basement, electrical connection. Every individual order follows exactly this sequence.

55 seconds, understandable without sound
At the end stand the four commitments that apply to you as a partner too: 4–6 working days on site per single-family home, a fixed price agreed before we set out, teams with their own van, a master craftsman in the team. Open the film as a file
Why firms work for us

Six things we settle beforehand

The site is prepared when you arrive

Site survey, equipment, material and access are settled with the client firm before a date is fixed. You do not drive out only to find the outdoor unit has not been delivered.

An order is an order, not an opening for renegotiation

Every job comes as an individual order with a fixed date, a fixed scope and a fixed price. If something is added, there is an amendment with a new sum — not a conversation about goodwill.

No material, no pre-financing

Equipment, pipes, insulation and small parts are supplied in full by the client. You bring people, a vehicle, tools and machines. Your money is not tied up in our project.

Plannable weeks instead of single days

We work in installation weeks. A firm that delivers reliably is allocated periods in advance and can build its own schedule on them.

Handover on the last day, invoice after that

Handover takes place on site with a written record. You invoice afterwards; the payment term is 21 days after the invoice has been checked, and instalments are possible on longer jobs.

We check you so that nobody has to check us both

Liability for minimum wage, social security contributions and construction withholding tax falls on the client. Hence the documents — they protect your payment just as much as our books.

The section

Five trades, one building

This is what the system looks like when it is finished. The numbers show which trade sits where — and therefore which part you would take on. The numbers lead to the matching trade.

System section · air-to-water monobloc · schematic, not to scale
FlowReturnPower and control
Five trades, one building Section through a house with a heat pump: outdoor unit on the foundation, buried line to the basement, core drilling through the wall, indoor unit with cylinders, heating circuit to the radiators, electrical connection. FROST-FREE GROUND OUTDOOR UNIT · MONOBLOC GRAVEL BED PRE-INSULATED EXTERIOR WALL LIVING SPACE RADIATORS NEW VALVES INDOOR UNIT HOT WATER BUFFER COLD WATER BASEMENT 12345
Swipe the drawing sideways
  1. InstallationSetting the outdoor unit, hydraulics, indoor unit and cylinders, connection to the manufacturer specification.
  2. HydraulicsPipework, connection to the heating system, flushing, filling, insulating.
  3. ElectricalSupply and control cables up to the meter cabinet, test record to DIN VDE 0100-600. Connection in the meter cabinet and registration with the network operator are done by the installer.
  4. ExcavationTrench for the buried line, backfilling, levelling the soil.
  5. FoundationStrip or pad foundation, plinth, condensate drainage with a gravel bed.

The trades we award

A heat pump in an existing building means five trades on one site: excavation, foundation, core drilling, hydraulics, electrical. Our teams can do all five. If we award a trade, it is because the schedule demands it or because it is cheaper and faster locally.

  1. Installation
  2. Hydraulics
  3. Electrical
  4. Excavation
  5. Foundation
  6. Core drilling
  7. Removal
  8. Oil tank
  9. Insulation
  10. Plastering
  11. Crane

What we expect in return

The same three things our clients expect from us: a team that masters the site, a system installed to the manufacturer specification, and a site left clean. Plus the documents without which a client in Germany is jointly liable for your people. Here is the list.

The road to your first job

  1. Qualify. Twelve questions on this page. At the end you see point by point what fits and what is missing.
  2. Phone call. We call within two working days and talk about trades, region and the fixed price per type of job.
  3. Framework contract. Your documents go into our partner file, the framework contract settles the basics. The terms are set out openly on this site.
  4. First individual order. Fixed date, fixed scope, fixed price, handover with a written record.
Questions

What firms ask first

Are you looking for fitters or for companies?

Companies. We engage subcontractors under a work contract at a fixed price per project. Employment as a fitter and temporary staffing are not offered through this page.

What do you pay?

The fixed price depends on the type of job, the trade and the journey, and is agreed in conversation. Guide prices on a website would be dishonest to both sides, because no two buildings are alike.

Do I have to travel across Germany?

No. For excavation, foundations and core drilling we are expressly looking for regional firms. Only the complete installation needs 4 to 6 consecutive working days per single-family home and therefore a willingness to stay overnight.

I work on my own. Is that possible?

Often yes, for single trades. Before the first job we then fill in the questionnaire on bogus self-employment together — anyone working permanently for a single client will otherwise hear from the pension insurance authority, and we along with them.

How long does the check take?

We get back to you within two working days. If your documents are complete, you can be on your first job within a week.

Which units do you install?

Heat pumps with a factory-sealed refrigerant circuit, among others from iDM, Bosch, Buderus, Viessmann and Stiebel Eltron: air-to-water monobloc units, in large plants also water-to-water and brine-to-water units. Split units with refrigerant lines are not part of what we do.

Does your firm fit us?

No registration, no account. The result appears on screen straight away — including what is still missing.

Qualify your firm